LSSIP Year 2019 Montenegro- Level 1 4 Released Issue
Introduction
The Local Single Sky ImPlementation (LSSIP) documents, as an integral part of the Master Plan (MP) Level 3 (L3)/LSSIP
mechanism, constitute a short/medium term implementation plan containing ECAC States’ actions to achieve the
Implementation Objectives as set out by the MP Level 3 and to improve the performance of their national ATM
System. This LSSIP document describes the situation in the State at the end of December 2019, together with plans
for the next years.
Chapter 1 provides an overview of the ATM institutional arrangements within the State, the membership of the
State in various international organisations, the organisational structure of the main ATM players - civil and military
- and their responsibilities under the national legislation. In addition, it gives an overview of the Airspace
Organisation and Classification, the ATC Units and the ATM systems operated by the main ANSP;
Chapter 2 provides a comprehensive picture of the situation of Air Traffic, Capacity and ATFM Delay per each ACC
in the State. It shows the evolution of Air Traffic and Delay in the last five years and the forecast for the next five
years. It also presents the achieved performance in terms of delay during the summer season period and the planned
projects assumed to offer the required capacity which will match the foreseen traffic increase and keep the delay at
the agreed performance level;
Chapter 3 provides the main Implementation Projects (at national, FAB and multinational level) which contribute
directly to the implementation of the MP Operational Improvements and/or Enablers and Implementation
Objectives.
Chapter 4 deals with other cooperation activities beyond Implementation Projects. It provides an overview of the
FAB cooperation, as well as all other multinational initiatives, which are out of the FAB scope. The content of this
chapter generally is developed and agreed in close cooperation between the States concerned;
Chapter 5 contains aggregated information at State level covering the overall level of implementation,
implementation per SESAR Key Feature and implementation of ICAO ASBUs. In addition, it provides the high-level
information on progress and plans of each Implementation Objective. The information for each Implementation
Objective is presented in boxes giving a summary of the progress and plans of implementation for each Stakeholder.
The conventions used are presented at the beginning of the section.
The Level 1 document is completed with a separate document called LSSIP Level 2. This document consists of a set of
tables organised in line with the list of Implementation Objectives. Each table contains all the actions planned by the
four national stakeholders (REG, ASP, MIL and APO) to achieve their respective Stakeholder Lines of Action (SLoAs)
as established in the European ATM Master Plan L3 Implementation Plan Edition 2019. In addition, it covers a detailed
description of the Implementation Projects for the State as extracted from the LSSIP Data Base.
The information contained in Chapter 5 – Implementation Objectives Progress is deemed sufficient to satisfy State
reporting requirements towards ICAO in relation to ASBU (Aviation System Block Upgrades) monitoring.